[MonteZooma's] LSMs now being tested with water dummies at [Knott's]
They were previously testing the winch recovery system in case of a valleyed train, and successfully sent empty trains through the loop at various speeds... besides finishing touches on theming, what is there left to do before this ride can be opened?