Am I being unreasonable - is this normal?
First time user of Taskrabbit here. Ikea quoted me $300 for assembly of a custom PAX unit and a desk. The PAX system contains 5 separate elements including one unit with drawers (the rest are shelves).To save some $$$, I built three of the units myself, except the two main ones that need installing on a metal rail into the wall. I hired a guy from Taskrabbit to 1. remove the baseboard, 2. build the frames of the remaining two units and attach them to the wall, 3. drill two holes into the back of the unit for access to electrical outlets, 4. join all the units together. No other work, no installing drawers, shelves or doors etc. He was new to Taskrabbit but a journeyman carpenter so I thought he would be good for the job. He took 7 hours to complete these tasks and even forgot to pull one of the electrical cords through despite me asking him to do so. Am I being unreasonable in thinking taking this long is extreme? I ended up getting charged $350 for his work despite him not even assembling half the unit!