

▲ 51 r/UTsnow
US Forest Service approves UDOT plan for improving BCC winter traffic, to be ready as early as the 2028-2029 winter season
* https://connect.udot.utah.gov/2026/05/13/udot-completes-big-cottonwood-canyon-environmental-study/
* https://udotinput.utah.gov/bccstudy#tab-50298
The original proposal is basically unaltered in its finalized version.
The only differences are a retaining wall being added to the Spruces Campground bus stop and an equipment shed location being changed at the proposed Solitude bus stop.
u/I_voted_for_Kodos_ — 14 hours ago