▲ 2 r/AskEngineers
I was assigned to day to check the movement and control joint of big ass basement 1 and 2 manually by doing it on a measuring tape, is this fair? Or am I being punished i got no labor working i am alone and it sucks 622 overall pieces of movement and control joints that i need to check all by myself.
u/Flaky-Bid136 — 9 days ago