I posted last night about options to secure my service mast. I've got that part figured out, but I'm running into another issue.
The spot that the engineer specified for the meter has a roof purlin running the entire distance of the wall, so I can't just notch it out and go through it.
I have a buddy who can bend 2.5" rigid conduit for me. Would it be kosher/normal to just bend around the 8" of roof overhang and go up from there?
Thanks for any input