u/B_and_M_queen

Image 1 — [Waldameer] 2027 New rollercoaster construction
Image 2 — [Waldameer] 2027 New rollercoaster construction
Image 3 — [Waldameer] 2027 New rollercoaster construction
Image 4 — [Waldameer] 2027 New rollercoaster construction
Image 5 — [Waldameer] 2027 New rollercoaster construction

[Waldameer] 2027 New rollercoaster construction

Extremely long H-piles being driven into the ground near Ravine Flyer 2.

Given the pattern that these are laid out in, and considering they are being driven in at an angle (to manage lateral loads) this looks to be a turn around or a drop down the cliff.

Waldameer owns the parcels highlighted in red, which goes down to the lake.
A few weeks ago there was a shipping manifest showing Vekoma had sent a shipment to Waldameer.

Exciting stuff! Looks to be like this ride will go down this cliff (about 90' according to topographic maps.)

u/B_and_M_queen — 5 days ago