Hi guys
In a dilemma what to do. So I've a solar system installed, and my 3 phase govt meter seems to run faster since the time it was installed. The import units from the grid feels like it runs faster, and my solars export units that go into the govt meter, that feels slower. Things don't align for me
Do i raise a complaint for meter challenge test, or what's the best solution
The backstory is that, to get this meter through the solar company, they take you to the govt office and there you get in touch with a govt official, so in short he asked us a larger bribe than what we thought, but since my contacts are good with the solar company, he reduced the bribe, you can't get the meter without a bribe is what I heard.
So we were thinking due to us giving him less bribe, did he fiddle with the meter, as he was the one who came to install the meter in our house. It's a L&T 3 phase meter. Since then we are having doubts. Been almost 3 yrs since we got the solar meter and slowly it feels like the meter doesn't take in solar units as it should.