u/StaticGamerYT

▲ 27 r/surat

Surat Metro Update

Surat Metro is designed for fully driverless operations which is why Engineers from GMRC and the General Engineering Consultant (GEC) are finetuning Train to Ground Radio. Because the metro is built on a driverless CBTC (Communication-Based Train Control) platform, they are testing the millisecond delays in emergency braking signals between the track sensors and the train.

The interior of Surat Metro Rail coaches will be designed keeping in mind the culture of Gujarat and Surat and industries that are synonymous with Surat's identity. Gujarat Metro Rail Corporation is planning to incorporate themes like diamond shape, garba, textile industry etc.

As of May 2026, the overall Surat Metro project has crossed 75% completion, with initial trial runs for Phase-I underway

Authorities say that Red line may be operational from June (Probably mid-end June)

Corridoor 1 - Red Line - Inside the Dream City depot, workers are now retrofitting the train interiors. To honor local identity, GMRC is installing custom interior panels utilizing diamond-cut geometric patterns on the grab-bars and ceilings, alongside subtle textile weave graphics on the walls to match the "Diamond Corridor" identity

Corridor 2 - Green Line - 500 Hour testing has been started already

Proposed Fares

No. Number of Stations Distance (km) Fare
1 1 to 3 stations 0 - 2 km ?10
2 4 to 6 stations 2 - 5 km ?15 ?20
3 7 to 12 stations 5 - 10 km ?25
4 13 to 20 stations 10 - 18 km ?30 ?35
5 More than 20 stations More than 18 km ?40

Source : News Articles like Dainik Bhaskar etc etc TOI etc etc

Line Name Terminals Length Stations
Red Line Sarthana DREAM City 21.61 km
Green Line Bhesan Saroli 18.74 km
Total 40.35 km 38
reddit.com
u/StaticGamerYT — 23 hours ago

Wassup People!

A fellow mod here, do not worry i ain't cranky or grumpy, From Surat, Gujarat

I've been using reddit for like 6 years now, I am a lover of tech, cinema, music, photography and all things art.

I do photography,

I play bass guitar and keyboard and harmonium

Im a cinephile

And a deep lover of good tech,

I am also an avid citizen activist who devours in helping make citizens daily life easy 😁

AMA you'd like to know about me (ofc not anything).

reddit.com
u/StaticGamerYT — 1 day ago
▲ 97 r/surat

Surat Updates that you don't wanna miss!

Railway Modernization and Traffic Mess

1. Mega Traffic Block Extended to May 30

The Western Railway has extended its block due to ongoing station redevelopment work on Platforms 2, 3, and 4. Check the NTES app for more info

Train Number & Name Status Update Affected Dates (2026)
12935 Bandra Terminus – Surat Terminates early at Udhna May 16 – May 30
20925 Surat – Amravati Details: Starts from Udhna instead of Surat May 17 – May 29
20926 Amravati – Surat Terminates early at Udhna May 16 – May 30
12936 Surat – Bandra Empty rake will only hit Surat after daily block operations wrap up Till May 30

2. Western Side Traffic Blueprint

  • A Meeting was held on 13/05/2026 at 11:00 AM at the Police Commissioner’s office. Attended by the Police Commissioner, Municipal Commissioner, SVNIT Experts, SITCO, and Traffic Police to bring immediate execution of road recarpeting, creating dedicated traffic lanes (separate for buses, cars, auto-rickshaws, and pedestrians), and upgrading traffic signals.

METROOOOO

  • Surat Metro: Project completion has crossed the 75% milestone, with testing and trials successfully expanding into the second corridor.

🤡 Fuel Conservation

After the following PM Narendra Modi’s nationwide appeal to save fuel, Surat authorities went into an overdrive:

(SMC) Changes

  • Personal government vehicles for field visits are officially out. All administrative tiers must do some carpool (4 officials per car lol) and Door to door garbage collection vehicles will now prioritize Electric Vehicles (EVs). Hundreds of new E-buses are being prepared to take over all BRTS routes to save money in fuel costs.

Surat police is also commited to do the same

  • Compulsory vehicle sharing among staff members**,** and Video conferencing replaces physical meetings; online court proceedings will be used for witness testimonies and deadlines to eliminate travel.

🗑️ New Solid Waste Management (SWM) Rule, 2026

Implemented by the Government of India starting 01/04/2026, source-level waste segregation into four distinct streams is now legally mandatory for every citizen:

  1. Wet Waste

  2. Dry Waste

  3. Electronic waste and expired meds etc

  4. Sanitary Waste

The Mahindra Thar Controversy is now Shelved

SMC completely killed a proposal to purchase 10 new Mahindra Thars for top municipal brass. This was happened after local media reports sparked public outrage, when the citizens were mockingly asking if officials needed off roaders just to navigate Surat's broken roads. Additional City Engineer (Workshop) Ashish Nayak confirmed the Commissioner originally floated the idea, but SMC issued a clarification that there is "no active consideration" to buy them unless a high-tier emergency arises.

Tapi Bhavan "Visitor Help Desk" & Chatbot Launch

SMC has launched a 24/7 Digital Help Line Desk Chatbot for immediate info on streetlights, water, road repairs, certificates (birth/death), and building permissions.

  • Citizens can meet the Municipal Commissioner directly every Monday.
  • The 4 Color Channels for Sorting Grievances:
    • 🟢 Green: Regular complaints.
    • 🟡 Yellow: Decision-related issues.
    • 🔴 Red: New work or grant-passing requests.
    • White: Suggestion submissions or greeting visits.
  • Other Features are as follows: Public Announcement Systems at headquarters, Variable Message Systems (VMS) for digital updates, and the "SMC Super Heroes Series" to honor responsible citizens.
  • SMC has also turned into content creation on social media, uploading skits and behind-the-scenes highlights to promote Commissioner Nagarajan's public welfare policies.

Water Supply ki baatein

1. Central Zone / South Division Leakage Fix

  • Urgent repair of a leakage near Sahara Darwaza on Nawabwadi Road (M.S. line from Umarwada Water Distribution Station) FROM Monday, 18/05/2026 (08:00 AM) to Tuesday, 19/05/2026 (11:00 AM). So expect Low to completely cut-off water supply in South Division areas: Begampura, Salabatpura, Gopipura, Sagarampura, Nanpura, Rudarpura, Soni Phalia, and surroundings.

2. Mota Varachha Pipeline Maintenance

  • Leakage repair and pipeline replacement work on Satellite Road (Overhead Tank M-4 at Mahadev Chowk Area). Started evening of 15th May. So basically its a massive hit to 3 Lakh+ residents experiencing low pressure/temporary shutdowns.
  • Specific Affected Areas: Sudama Chowk to Yamuna Chowk, Satellite to Lajamani Chowk, Gamtal, Hans Society, Anjani Row House, Shabri Dham, Yamuna Darshan, Vrindavan Society area, Shiv Park, Maruti Nandan, Satyam Row House, Shivam Row House, and Dharmanandan Society.

Misc. News hai ye

  • 112 Integration: SMC is the first municipal corporation in Gujarat to completely integrate with the 112 Emergency Response System. It merges Police, Fire, and Medical response under one number using GPS-based tracking and mobile app deployment.
  • Public Transport Safety: Supreme Court has pulled in a mandate, panic buttons and GPS tracking systems are now strictly compulsory in all public transport vehicles.
  • Zoo Upgrade - To keep the animals safe during the brutal summer peak heat, Sarthana Nature Park has installed specialized air coolers and hydration setups throughout the enclosures.

KUCH Personal Vichaars

Dont you think aajkal humare instagram news pages have been posting irrelevant things and cringe content? I personally feel like they have forgotten their role as a news page.

And yes after many dms and comments, i have now stopped using AI completely to frame these updates, Im typing it all on my own. Kuch cheezein mai directly copy paste karta hu agar wo SMC ke official updates ho toh, (if they've used AI then i cannot help lol)

Btw the source of these news are - Instagram news pages lol, twitter, TOI, Deshgujarat

reddit.com
u/StaticGamerYT — 4 days ago
▲ 31 r/surat

They have fixed the doors according to the contract, But here's a catch!

- None of the stations are maintained at all,

- Jhaadu se cleaning hoti hai but it does not clear the dirt that has been stuck for years

- The AFCS gates do not work at all and SMC seems to do nothing about it.

- People do not know how these doors work, they tend to just push it open on their own, and that's the biggest failure of SMC, they could have put stickers to STOP ppl from interacting with the sliding doors.

- It's all a waste, our city's public transport will never get fixed if the SMC does not put proper efforts and if the citizens do not understand even to the slightest bits.

u/StaticGamerYT — 4 days ago
▲ 4 r/surat

So I recently learnt about the Bharat Yatra card and our city has a poor public transport system that is Surat BRTS,

We have a Surat money card here which is provided by ICICI Bank, it is also an NCMC card powered by RUPAY.

So thought if both the cards share the same tech, then maybe somehow I can use it for my BRTS bus transit? It cost me 19 rupees as I ordered it on Zepto.

u/StaticGamerYT — 17 days ago

So I recently learnt about the Bharat Yatra card and my city has a poor public transport system that is Surat BRTS,

We have a Surat money card here which is provided by ICICI Bank, it is also an NCMC card powered by RUPAY.

So I thought if both the cards share the same tech, then maybe somehow I can use it for my BRTS bus transit?

It cost me 19 rupees as I ordered it on Zepto.

u/StaticGamerYT — 17 days ago

Please ignore whatever I have said in the video. I did not plan to upload this. I was just talking to my friends anyways. So basically the thing is that my city has a large coverage of these BRTS stations but none of them are maintained properly, they are dirty, the afcs gate does not work at all and they have been disabled by the municipal corporation, they are only used for NFC cards which are under a scheme.

The sliding doors do not open properly at all and even the bus drivers are reckless. They do not care if the passengers are able to get off the bus properly or not, there have been many times when I was travelling via the BRTS bus and the sliding door wouldn't open, the bus would run away and I would clean to the sliding door and push it open manually, and people here have become comfortable with that, they always touch the sliding doors and just use their full energy to open it as their brains have been hardwired that the door is meant to be opened by them.

Well one thing is that the municipal corporation recently revamped the e-ticketing app, while it looks like a college project app but it works so that so good thing, but whatever was promised that people will be able to track the bus live using itms and what not, live occupancy feature, none of them are available in the app, the Google maps integration for tracking the bus does not work at all and it is highly prone to error.

I feel sad that public transport here is not maintained properly and the City is really pushing the metro construction on a blazing speed, while I love the metro but BRTS just walks as it is way more cheaper and it provides AC buses, but with a catch that the diverts are reckless and the system is completely Unmaintained

u/StaticGamerYT — 21 days ago
▲ 34 r/surat

According to a recent Quotation/Tender,

Work: Sliding door systems for BRTS bus shelters

Scope: Supply + Installation + Testing + Commissioning (SITC) + removal of damaged parts

Works and items that are included: The tender requires a contractor to supply, install, test, and commission complete sliding door systems along with components like motors, controllers, RF readers, emergency switches, and laminated toughened glass for BRTS bus shelters. The contractor must have at least 7 years of experience and handled 300+ sliding doors, with no subcontractor work accepted. Payment includes no advance, 95% after completion, and 5% after 6 months. The work must be completed within 45 days with a penalty of ₹250 per day for delays, and quotations must be submitted by 1 April 2026. The contractor must visit the site, include all costs (excluding GST), follow safety standards, provide fully functional doors, and submit a ten thousand rupee security deposit. The glass used must meet IS standards with a specified laminated structure.

u/StaticGamerYT — 23 days ago

Basically

According to a recent Quotation/Tender,

Work: Sliding door systems for BRTS bus shelters

Scope: Supply + Installation + Testing + Commissioning (SITC) + removal of damaged parts

Works and items that are included: The tender requires a contractor to supply, install, test, and commission complete sliding door systems along with components like motors, controllers, RF readers, emergency switches, and laminated toughened glass for BRTS bus shelters. The contractor must have at least 7 years of experience and handled 300+ sliding doors, with no subcontractor work accepted. Payment includes no advance, 95% after completion, and 5% after 6 months. The work must be completed within 45 days with a penalty of ₹250 per day for delays, and quotations must be submitted by 1 April 2026. The contractor must visit the site, include all costs (excluding GST), follow safety standards, provide fully functional doors, and submit a ten thousand rupee security deposit. The glass used must meet IS standards with a specified laminated structure.

The bidding of the tender ended on 20th of April

u/StaticGamerYT — 23 days ago