u/Perfect_Chemical4163

Magnolia Blvd street work.

Anyone know their final plan ?

Because the entire right side heading towards downtown is so sloppy and the paving is ragged.

Huge patches on several blocks.

I’m hoping they smooth it out correctly. Instead of working on it slowly over and over again for months.

reddit.com
u/Perfect_Chemical4163 — 2 days ago