I’m quoting out a job. It’s bigger than anything I’ve done so far, and would be my first dip into doing some bigger stuff.
It’s replacing a 9 foot tall, 20 foot by 20 foot wide garbage corral. All made of wood, which is currently supported by posts sunk into concrete.
I can quote out removal, disposal and materials pretty easily, but I’m worried about either selling myself short or quoting some stupid massive number. This is a commercial client in a HCOL area
Any tips?