
Went and looked at a spec house another builder is having done. This is what I found for the slider. I grew up around this stuff and anything within like an 1/8 was ok for most places. (Now it's 1/16) I told his PM and he says I'll shim it. Do you make the sub fix it on his dime or shim it and let it go? The actual builder has no idea about it as he never goes out on site.
Edit: I'll be calling the actual owner/ builder tomorrow and letting him know this shit is like that. He has a few framing crews he uses. Some do decent work and then walked into this mess.