AutoDesk Forma Main Contract set up?
Has anyone found a way on ACC / Forma to link a Budget Code multiple times to the Main Contract breakdown / SOV breakdown?
I have a project where we are building 6 buildings for a client, and we have say 25 budget code items on my internal breakdown. However, the client wants the Contract and Schedule of Value set up by building and not by phase of the build.
If it was the later, I could easily lump design budgets together, materials budgets together, and then build budgets together and link them to the Main Contract once and be done. But having it split by building means that I technically have all 25 budget codes that need to be distributed proportionately across all 6 buildings.
I can't find an option in ACC / Forma to do this. I can see how to do this with PO / sub-contracts, but not with my main contract and SOV.
Any help or advice would be greatly appreciated. Thanks