u/Existing-Fondant4092

Image 1 —
Image 2 —
Image 3 —
Image 4 —
Image 5 —
Image 6 —

This is some steam piping I did, 4” carbon steel low pressure steam about 12psi. Added new gate valves branch lines, warm up bypass line, pressure gauge most of it is welded. Also added roller hangers for expansion and contraction.
Gate valve is not in correct orientation due to it not being tied in yet. We wanted to get it in place to get some accurate measurements. Then we have to tie in and put the flexatualic gaskets in and test the system. Bleed condensate down then slowly open steam to pressurize.

u/Existing-Fondant4092 — 7 days ago