




I would like to have your professional feedback. I live in social housing. Today my housing association changed a bath. All connected. The bath is filled up with water for the next 24 hours. Now I have time to fulfill my curiosity about how it looks without the bath panel. And it concerns me a bit as the bath legs are not placed in the middle of the wooden blocks, but mostly on the edge (photos 1 and 2). Am I overthinking and it should be fine? Also, the nuts on the legs look like they should be screwed up or down, should they? And the last one – bonding wire (it's not earthing in this case, right?) which looks like it was connected to the old bath on one side and, probably, to the pipe on the other – it is disconnected now (photos 3 and 4). Is it ok too? The pipes themselves are bonded, from what I can understand. In the morning they are coming to put up a bath panel. As I said, it is social housing, I haven't directly paid for the job. Is it okay or too bad? (Photo 5 - general look).
Thank you in advance!
UPDATE. Thank you everyone who was able to answer my probably naive questions! It was informative and assuring.
UPDATE 2. It was assuring! Not assuming, as it was written previously. Autocorrection, you know.