
u/Aggressive-Hawk9186

I applied on February, by the processing times tracker page, I'm supposed to be at the last steps on Aug-Sept. I have a trip I can't postpone on August. I've read thst between P2 and eCopr you can ask IRCC to "delay" because you're not in Canada. If it's correct, how does that work? Does it add a lot of time overall, or is it a smooth process?
Thx
edit. French Stream, inland
I've only lived with my family, SO or alone but now I will need to share an apartment for a temporary job and I have no idea how is the dynamic in a shared apartment.
Like do you share about your life, just say hi and go to your room?
It may sound stupid but I have no idea lol
É uma loteria, as vezes carrega, na maioria das vezes nao, as vezes carrega no pip que nem devia existir, dai vc volta e trava, por favor coloquem na sprint de setembro pra ser feito em dezembro, 5 pontos só
noticia irrelevante sobre o assunto, mas foi a gota d'agua, eu queria ter visto kkk